These constraints impede or delay the
start of activities.
Th
j
t
t
i t
ree pro ec cons ra n s:
› Technical or logic constraints
› Resource constraints
› Physical constraints
Kinds of resource constraints
› People
› Materials
› Equipment
› Working capital
2
©CKL-PMGT2010
3
©CKL-PMGT2010
Two types of problems: time constrained
project and resource constrained project
A time constrained project is one that must
be completed by an imposed date .
Resource usage should be no more than is
necessary and sufficient.
A resource constrained project is one that
assumes the level of resource available
cant be exceeded. If the resources are
inadequate, it will be acceptable to delay
th
j
t b t
littl
ibl
e pro ec , u as
e as poss e
4
©CKL-PMGT2010
Assumptions:
› Splitting activities will not be allowed.
› The level of resource used for an activity
cant be changed
› These assumptions do not exist in
practice, just to learn.
5
©CKL-PMGT2010
It focuses on resource utilization by using
resource leveling techniques which
balance or smooth demand for a
resource.
Leveling techniques delay noncritical
activities by using positive slack to
reduce peak demand and fill in the
valleys for the resources.
Example of Botanical Garden project
that uses only one resource (Backhoes).
All backhoes are interchangeable.
6
©CKL-PMGT2010
7
©CKL-PMGT2010
The peak of demand for the resource
was reduced
Resources over the life of project have
been reduced.
The fluctuation in resource demand were
minimized.
8
©CKL-PMGT2010
It’s happened when the number of people
d/
i
t i
t d
t t
t
an or equ pmen s no a equa e o mee
peak demand requirements and it is
impossible to obtain more.
So, it’s to prioritize and allocate resources to
minimize project delay without exceeding
the resource limit or altering the technical
network relationships.
So, Scheduling resources using heuristic
rules in the order:
› Minimize slack (Rule1)
› Smallest duration (Rule2)
› Lowest acti