Service Repair Manual
Models
950H WHEEL LOADER
Shutdown SIS
Previous Screen
Product: WHEEL LOADER
Model: 950H WHEEL LOADER M1G
Configuration: 950H Wheel Loader M1G00001-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
IT62H Integrated Toolcarrier and 950H and 962H Wheel Loaders Power Train
Media Number -RENR8867-05
Publication Date -01/06/2014
Date Updated -27/06/2014
i02348371
Torque Converter from Transmission, Output Transfer
Gears - Separate
SMCS - 3003-076
Separation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A
138-7574
Link Bracket
1
B
138-7573
Link Bracket
3
1U-9200
Lever Puller Hoist
1
Start By:
A. Remove the torque converter, the transmission, and the output transfer gears. Refer to
Disassembly and Assembly, "Torque Converter, Transmission and Output Transfer Gears -
Remove".
Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of the
component should be thoroughly cleaned. This will help to prevent dirt from entering the internal
mechanism.
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting and repair
of the product. Be prepared to collect the fluid with suitable containers
1/5
950H Wheel Loader M1G00001-UP (MACHINE) POWERED BY C7 Engine(SEBP4...
2020/4/8
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop
Products Guide" for tools and supplies suitable to collect and contain
fluids on Caterpillar products.
Dispose of all fluids according to local regulations and mandates.
Illustration 1
g01173182
1. Disconnect harness assemblies (2) and (5) .
2. Remove tube assembly (4) .
3. Remove bolts (3) and transmission oil pump (1) .
Illustration 2
g01173184
4. Remove tube assembly (6) .
2/5
950H Wheel Loader M1