2006
Environmental Quality Incentives Program Cost-Share Rates
313 Waste Storage Facility2
No.
391 Riparian Forest Buffer
Ac.
50%
558 Roof Runoff Structure
No.
50%
Less than .25 mile from receiving water
75%
393A Filter Strip
Ac.
50%
560 Access Road
Ft.
50%
.25 to .5 mile from receiving water
75%
395 Stream Habitat Improvement and Management
Ac.
50%
561 Heavy Use Area Protection
Ac.
50%
.5 to 1 mile from receiving water
75%
410 Grade Stabilization Structure
No.
50%
571 Soil Salinity Management-Nonirrigated
Ac.
25%
Greater than 1 mile from receiving water
50%
412 Grassed Waterway
Ac.
50%
572 Spoil Spreading
Ac.
25%
Over a shallow aquifer
75%
422 Hedgerow Planting
Ft.
50%
574 Spring Development
No.
50%
314 Brush Management
Ac.
40%
428A IWC-Nonreinforced Concrete Ditch and Canal Lining
Ft.
25%
575 Animal Trails and Walkways
Ac.
50%
316 Animal Mortality Facility
No.
50%
428B IWC Flexible Membrane Ditch and Canal Lining
Ft.
25%
578 Stream Crossing
Ft.
50%
317 Composting Facility
No.
50%
430AA IWC-Aluminum Tubing Pipeline
Ft.
25%
580 Streambank & Shoreline Protection
Ft.
50%
320 Irrigation Canal or Lateral
Ft.
25%
430CC IWC Nonreinforced Concrete Pipeline
Ft.
25%
582 Open Channel
Ft.
25%
326 Clearing and Snagging
Ft.
25%
430DD IWC High-pressure, Underground, Plastic Pipeline
Ft.
25%
584 Channel Stabilization
Ft.
40%
338 Prescribed Burning
Ac.
40%
430EE IWC Low-pressure, Underground, Plastic Pipeline
Ft.
25%
587 Structure for Water Control
No.
50%
342 Critical Area Planting
Ac.
75%
430FF IWC Steel Pipeline
Ft.
25%
595 Pest Management
Ac.
40%
348 Dam, Diversion
No.
75%
432 Dry Hydrant
No.
25%
600 Terrace
Ft.
50%
350 Sediment Basin
No.
40%
436 Irrigation Storage Reservoir
Ac.Ft
25%
612 Tree/Shrub Establishment
Ac.
40%
351 Well Decommissioning
No.
40%
441 Irrigation System, Microirrigation
No.
25%
614 Watering Facility (Trough or Tank)
No.
50%4
356 Dike
Ft.
40%
442 Irrigation System Sprinkler
No.
25%
620 Underground Outlet
Ft.
25%
359 Waste Treatment Lagoon
No.
50%
443 Irrigation System Surface and Subsurfa