Service Repair Manual
Models
M325D L MH EXCAVATOR
Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: M325D L MH EXCAVATOR KAY
Configuration: M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
M325D Material Handler Machine Systems
Media Number -RENR9719-02
Publication Date -01/03/2011
Date Updated -16/03/2011
i02233131
Swing Drive - Assemble
SMCS - 5459-016
Assembly Procedure
Table 1
Required Tools
Tool Part Number
Part Description
Qty
A
138-7573
Link Bracket
2
B
5P-5197
Pliers
1
E
138-7574
Link Bracket
2
F
138-7575
Link Bracket
3
G
5P-3931
Anti-Seize Compound
1
H
1U-8846
Gasket Sealant
1
J
9S-3263
Thread Lock Compound
1
K
1P-0520
Driver Gp
1
Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned
in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts.
Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are
worn or damaged, use new parts for replacement.
1/10
M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine(...
2020/11/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
Illustration 1
g01126093
1. Use Tooling (K) to install lip seals (28) and O-ring seal (29) in bearing cage (27) .
Illustration 2
g01126367
Note: Lubricate the seals and the seal surface of the shaft with the lubricant that is being
sealed prior to installation of bearing cage (27) .
2. Install bearing cage (27) on pinion shaft (24) .
2/10
M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine(...
2020/11/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
Illustration 3
g01126373
3. Raise the temperature of bearing (30). Install bearing (30) on pinion shaft (24) .
4. Install spacer (31) .
Illustration 4
g01126447
5. Ra