Tel. (848) 3832 - 7204 – (849) 03615612, Fax: (848) 3832 – 8393
Email: aimcontrol@vnn.vn, ceo@aimcontrolgroup.com, www.aimcontrolgroup.com
Inspections, Surveys and Certificates
Navigator
Module 1
Framework of Surveys and Certificates
Module
2
Class Surveys and Certificates
Module
3
Statutory Surveys and Certificates
Module
4
On-board surveys
Module
5
Other Types of Surveys
Module
6
Systems for surveillance of Surveys and
Certificates
Navigator
Module 1
Framework of Surveys and Certificates
Module
2
Class Surveys and Certificates
Module
3
Statutory Surveys and Certificates
Module
4
On-board Surveys
Module
5
Other Types of Surveys
Module
6
Systems for surveillance of Surveys and
Certificates
Module 1: Framework of Surveys and Certificate
• Reasons and Aims for Surveys
• Instruments to verify compliance
• Summary
Module 1: Framework of Surveys and Certificates
Reasons and Aims for Surveys
Answer: (examples)
• quality of the ship
• quality of the cargo hold
• safety of crew
• seaworthiness
• life extension planning
• corrosion trend analysis
• repair and maintenance
requirements
• insurance
• sale and purchase
• working conditions
• after repair
• convention requirements (law,
rules, regulations, …)
• design and structural details
• problem areas
• future inspection requirements
• agreements
• …
Module 1: Framework of Surveys and Certificates
Instruments to verify Compliance
Plan approval
Survey
Audit
Verification
Approval
Certificate
Example:
- Ship Security Plan
(ISPS)
- Shipboard Oil
Pollution
Emergency Plan
(MARPOL)
- Plan Approval for
New buildings
Example:
- Safety
Construction Cert.
(SOLAS II-1)
- Safety Equipment
Cert. (SOLAS III, V)
- Class Certificate
Example:
- Document of
Compliance (ISM)
- Safety
Manage