Tejjy Inc. proactively identifies and resolves these issues during the preconstruction phase using advanced BIM technology.
Detect and resolve conflicts early
Enhance coordination among all trades
Improve construction quality and safety
Minimize project risks and disruptions
Choose Tejjy Inc. for reliable MEP clash-free design that ensures a smarter, smoother construction process.
Tag Cloud
The Risk of Skipping MEP Clash
Detection
What is MEP Clash Detection?
Clash detection identifies conflicts between Mechanical, Electrical, and
Plumbing systems before construction begins.
It ensures all elements work together seamlessly in a 3D BIM environment.
Cost Overruns
Unidentified clashes lead to rework on-site, which increases material
wastage, labor costs, and project delays.
Fixing a clash post-construction costs 5x more than during design.
Project Delays
On-site conflicts halt construction until issues are resolved.
This disrupts schedules and affects project timelines.
Safety Hazards
Improperly placed systems can create safety risks—like blocked access
to fire exits, overloaded electrical routes, or HVAC duct interference.
Poor System Performance
Without coordination, systems may not operate efficiently.
Examples: HVAC ducts clashing with structural beams or plumbing lines
intersecting with electrical conduits.
The Smart Move – BIM Coordination
With BIM clash detection, all MEP systems are checked in a virtual
model.
Conflicts are resolved before construction, ensuring faster execution,
reduced cost, and safer buildings.
http://www.tejjy.com/
https://www.tejjy.com/our-services/mep-services/mep-coordination-services/
https://www.tejjy.com/our-services/mep-services/mep-coordination-services/
www.tejjy.com | info@tejjy.com
We specialize in BIM-based MEP Clash Detection & Coordination.
Partner with Tejjy Inc.
Detection
What is MEP Clash Detection?
Clash detection identifies conflicts between Mechanical, Electrical, and
Plumbing systems before construction begins.
It ensures all elements work together seamlessly in a 3D BIM environment.
Cost Overruns
Unidentified clashes lead to rework on-site, which increases material
wastage, labor costs, and project delays.
Fixing a clash post-construction costs 5x more than during design.
Project Delays
On-site conflicts halt construction until issues are resolved.
This disrupts schedules and affects project timelines.
Safety Hazards
Improperly placed systems can create safety risks—like blocked access
to fire exits, overloaded electrical routes, or HVAC duct interference.
Poor System Performance
Without coordination, systems may not operate efficiently.
Examples: HVAC ducts clashing with structural beams or plumbing lines
intersecting with electrical conduits.
The Smart Move – BIM Coordination
With BIM clash detection, all MEP systems are checked in a virtual
model.
Conflicts are resolved before construction, ensuring faster execution,
reduced cost, and safer buildings.
http://www.tejjy.com/
https://www.tejjy.com/our-services/mep-services/mep-coordination-services/
https://www.tejjy.com/our-services/mep-services/mep-coordination-services/
www.tejjy.com | info@tejjy.com
We specialize in BIM-based MEP Clash Detection & Coordination.
Partner with Tejjy Inc.